Jiangmen NMP recovery system

Published on: 2024-03-09 15:11
Read: 2


Basic parameters and configuration:

workmanship

Positive pole: high tower return air+tail gas water washing direct discharge / Negative pole: waste heat recovery+condensation return air+tail gas direct discharge

recovery unit

Design parameters

Waste gas treatment capacity

Positive pole: 156500m ³/ h. Negative electrode sleeve: 110800m ³/ h. Set

Tail gas emission concentration

≤ 25mg/m ³

NMP recovery rate

≥ 99%

NMP recovery solution concentration

≥ 90%

Design service life

15 years

Heat recovery efficiency

≥ 75%

Share

推荐

  • 0755-84232331
  • mailbox:s.s.d@tianruide.com
  • Back to top